MJM were selected as the fit-out contractor for the Denim Bar concession store by Harrods of London. Client required fast turn around on this job which MJM completed within in the time frame of 12 days from concept to completion. This work was carried out in an occupied area were health and safety of the public was a prerequisite
Download our brochure»
If you would like more detailed information about any of our case studies, you can sign up for access by filling in your details…