MJM Group

Harrods Denim Bar

MJM were selected as the fit-out contractor for the Denim Bar concession store by Harrods of London. Client required fast turn around on this job which MJM completed within in the time frame of 12 days from concept to completion. This work was carried out in an occupied area were health and safety of the public was a prerequisite