Westerdam Fit-out

MJM were awarded the contract to fit out the public areas of this 5 star cruise liner in Palermo Italy. The turnaround time for this contract was 21 days in April 2007 and we had 25 skilled tradesmen travel to start once the ship dry-docked.

Demolition of existing shops area and replacement with new "open plan" arrangement for Beauty Shop, Main Shop and Costume Jewellery Shop.