MJM Group

Zuiderdam Fit-Out

MJM were awarded the contract to demolish existing shops and library area and replace with new "open plan" arrangement for:

* Beauty Shop
* Main Shop
* Costume Jewellery Shop
* Fine Jewellery Shop
* Fine Watch Shop

The work took place while the Zuiderdam was dry docked in Palermo, Italy. We sent out 40 skilled tradesmen along with 10no. 20 ft containers and various loose shipments to complete the works within the 21 day contract period in April 2008.

Download our brochure»

If you would like more detailed information about any of our case studies, you can sign up for access by filling in your details…

simple_captcha.jpg
(type the code from the image)

Sl380237
  • Sl380237_tn
  • Sl380384_tn
  • Sl380255_tn
  • Sl380357_tn